9.30am - 12.30pm Sunday Feb 5th 2012.
A hole has developed on section 3 just after the stone bridge due to drainage issues . this will be dealt with as a priority .
depending on how many turn up the manky log drop before the north shore section will be regraded back to red (it's well past black at the mo).
If enough interest is shown there is a plan for a black alternate route in that area but we'll see how that goes in near future.
Look for the NEFA trail building session event on Face Book.
Event added by: mega_waster
IMPORTANT: To the best of our knowledge the details provided are accurate at the time of listing. However, as with
any outdoor event of this type, there can always be unforeseen circumstances that will lead to changes or cancellations. For all demo days, please check
with the organiser directly to confirm the event is going ahead, timing, location, bike availability and any other additional detail.